Fortune Telling Collection - Ziwei fortune-telling - What are the lighting projects?

What are the lighting projects?

The design projects of river lighting project in the main urban area of Suzhou include: Huiyuan Dagou (New Bianhe-Tuohe River), Beiguan Diversion River (Tuohe-Huancheng River), Huancheng River (around), Liangyun River (around Huancheng River-Yingbin Avenue), Sanbagou (around Liming Avenue and the intersection of Yinhe No.2 Road-Sanbagou and Sanba River) and Sanba River (Shengli Road-Sanba River).

The connecting line around the river (the intersection of Sanbagou and Sanbagou-Huanhe), Sumengdagou (Yingbin Park-Liangyunhe), Tuohe (Delta Park-Huaihe Road), Longhe (International Garden Yingbin Square-Downstream River Fork), the north and south reservoirs of the railway station, etc. Among them, Huancheng River (around), Liangyunhe (around Huancheng River-Yingbin Avenue) and Sanbagou (around Liming Avenue)

Park nodes such as Yinhe No.2 Road-intersection of Sanbagou and Sanbahe River), Sanbahe River (intersection of Shengli Road-Sanbagou and Sanbahe River), Sumengdagou (Yingbin Park-Liangyunhe), Tuohe River (Delta Park-Huaihai Road) and the surrounding area of the river-crossing bridge are the key design areas.

Extended data:

Lanzhou Yellow River Eco-tourism Development Co., Ltd. issued the Notice of Design and Construction General Contract and supervision bidding for the Core Section of Landscape Lighting Improvement Project of the Yellow River Customs Line. The project is located along the Yellow River customs line, starting from Xiaoxihu overpass in the west and Yantan Yellow River Bridge in the east, with a length of about 8 kilometers.

The core project of this implementation includes five parts ***39 node projects and 1 control system. The estimated investment of the project is 99865438+900,000 yuan, and the construction period is 60 days. The five parts of the core project and 1 control system are as follows:

The first part: skyline and contour line (Baita Mountain; The steps and railings of Baitashan Park; Forest of steles steps, railings).

Part II: Bridge (Xiaoxihu Yellow River Bridge).

The third part: pedestrian overpass (convention and exhibition center overpass; Dongfang Gong overpass; Music fountain overpass; Jin Chengguan Huimin Middle School overpass; National Song and Dance Troupe overpass; Long Yuan Park Flyover; Shuicheyuan overpass).

Part IV: Yellow River Landscape Belt (Huo Qubing Theme Park; Shuangyong Square; Lanzhou Sports Park; Green park; Citizen Square Phase II; Park for the elderly; Lanzhou water parking lot; Yellow River Mother Park; Long Yuan Park; Riverside greening landscape trail system of Yanyan Bridge-Jin Yan Bridge.

Jin Yan Bridge-Chengguan Bridge Riverside Green Landscape Trail System; Chengguan Bridge-Tong Yuan Bridge Riverside Green Landscape Trail System; Tong Yuan Bridge-Zhongshan Tieqiao Riverside Greening Landscape Trail System; Zhongshan Railway Bridge-Xiaoxihu Yellow River Bridge Riverside Greening Landscape Trail System; Green landscape belt on the east and west sides of the north bank approach bridge of Chengguan Bridge; Music Fountain Square-Water Pump Room).

Part V: Building nodes (Gansu Provincial People's Congress office building; Yellow River Customs Line Management Office; Jardine Garden; Lanzhou Municipal People's Government; Investigation team of the National Bureau of Statistics; Former site of Wang Baobao City; Air combat memorial pavilion; Lanzhou Square; Wang crane tower; Baiyunguan; Lanzhou Federation of Trade Unions Office Building; Family members' hospital of the Municipal Construction Committee).

Control system platform: centralized control center, Baita Temple interactive system platform, Zhongshan Bridge interactive system platform and other node contents.

Phoenix Net-With a total investment of about 60 million yuan, Suzhou 1 1 river design is invited for bidding.

Phoenix net -60-day "reconstruction plan" 8 km yellow river customs line lighting project.