How to do the greening project budget? What should I pay attention to?
How to do the greening project budget?
1, according to the name, variety, specification, quantity of seedlings in the construction design drawing and the corresponding unit price of seedlings in the market price information, multiply the quantity and unit price to calculate the complex price. Then add up all the complex prices and work out the total cost of seedlings needed for this project.
2. Determine the construction scheme according to the terrain elevation required by the construction design drawings and the actual situation of the terrain and soil quality on the construction site, calculate the quantity of excavated materials to meet the design terrain elevation requirements and drainage requirements for plant growth, and then calculate the cost of garbage soil and planting soil respectively according to the unit price of earthwork specified in the document.
3, according to the relevant provisions of the construction area and quota on the construction design drawings, calculate the labor costs required for earthwork leveling, scarifying and sorting out the green space before seedling planting. According to the name, variety, specification and quantity of engineering seedlings on the construction design drawing and the corresponding base price of Buddhism.
Problems needing attention in compiling greening project budget
It is necessary to fully combine the actual situation and reasonably control the amount of building materials. The price control of building materials plays a very important role in the cost control of landscaping projects. In the whole landscaping project cost, the engineering material cost is the biggest cost expenditure.
The cost of engineering materials accounts for 70% of the total project investment, which must be effectively controlled. When selecting construction materials, we should purchase materials in strict accordance with the requirements in the construction agreement, and reduce the cost as much as possible on the premise of ensuring the quality of materials.
When changing the project construction plan, we should control the cost reasonably. In the final accounts of landscaping projects, staff need to accurately calculate all the data in statistical reports and check the changes of each project, so as to narrow the difference between the total construction volume and the project cost budget.
For more information about project/service/procurement bidding, and to improve the winning rate, please click on the bottom of official website Customer Service for free consultation:/#/? source=bdzd
- Previous article:How to evaluate the main plot of Genshin Impact Feng Dan?
- Next article:Wei Zi was burned to death.
- Related articles
- Double star combination-Wu Qu's seven kills
- Wei Zi ChristianRandPhillips Ensemble
- Where is Liuyang No.4 Middle School?
- Poetry about stillness
- Ask for fuzhou west lake park's guide words
- What does it mean that Rizhao incense burner produces purple smoke?
- Is the prototype of Andrew Yongzheng?
- Yin Ziwei Palace
- Wei Zitai said later
- Use of Seal of Xunlei Company