Fence installation contract

202 1 fence installation contract template

With the continuous development of the spirit of the rule of law, people pay more and more attention to contracts, and the frequency of their use is also rising. Contract is a very important factor in enterprise development. Then do you know the format of the contract? The following is the model of 202 1 fence installation contract that I carefully arranged for reference only. Welcome to reading.

Entrusting party of fence installation contract (Party A) 1:

Organizer (Party B):

After friendly negotiation between Party A and Party B, Party A decided to entrust Party B to make and install the fence. In order to ensure the smooth progress of the project, this contract is hereby signed in accordance with relevant national laws and regulations for * * * to abide by.

Article 1: Project Overview

1. Project address: _ _.

2. Fence specifications: See the drawings.

3. Construction content: fabrication, installation and painting of the fence.

4. Entrusting method: contracting for work and materials.

5. Commencement date: May 20xx, completion date:1May 9, and total project days: 4 days.

Article 2: Project Price

Project price (amount in words) (ordinary invoice issued by Party B).

Article 3: Quality Requirements

1. The varieties, specifications and names of the main materials used in the project shall be approved by both parties.

2. The acceptance criteria of the project shall be agreed by both parties with reference to Party A's requirements. The specific requirements are as follows:

A fence welding: select welding materials according to the requirements and specifications (national standard) of the drawings, and construct the fence in strict accordance with the drawings. The weld at the welding place should be full and firm, without dripping and splashing;

B. Column foundations: made in strict accordance with the drawing size, and all foundations must be on the same horizontal plane;

C. Fence painting: Primer (rust red) twice, topcoat (lake blue) twice, without color difference and sagging.

D. After the fence is installed, the main body of the fence should be horizontal, flat and vertical, beautiful and generous.

4. Party B shall be responsible for the quality of all materials it purchases; Party B shall be responsible for the quality of the project.

5. Party A shall conduct on-site supervision and inspection at any time, and require Party B to rectify the non-conformities of on-site construction proposed by Party A immediately.

Article 4: Method of Payment

After the contract is signed, there is no advance payment. After Party A accepts the completion of the project, Party B will pay all the project funds with the invoice.

Article 5: Party B's responsibilities

1. Assign a staff member as the on-site representative of Party B to be responsible for the performance of the contract, organize the construction according to the requirements of the contract, and complete the construction task on time with good quality and quantity.

2. Be responsible for the safety, fire prevention, related certificates and civilized construction of the construction site, and prevent accidents such as damage to articles caused by construction from affecting others. If it happens, it must be repaired or compensated as soon as possible.

3. Party B must be responsible for the personal safety of on-site construction personnel. In the event of a safety accident, all responsibilities shall be borne by Party B, not by Party A. ..

Article 6: Entry into force of the contract

1. The attachment is 1 drawing, which has the same legal effect as the contract.

2. This contract shall come into effect after being sealed or signed by both parties.

3. This contract is made in duplicate, with each party holding one copy.

Party A: Party B:

Signature: signature:

Date of signing: Date of signing:

Fence Installation Contract 2 Owner (full name): (hereinafter referred to as Party A)

Contractor (full name): (hereinafter referred to as Party B)

In accordance with the Contract Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC) and other relevant laws and administrative regulations, and following the principles of equality, voluntariness, fairness and good faith, both parties reach an agreement on the construction of this construction project and conclude this contract.

I. Overview of the Project

1, project name: fence installation project of 20xx natural grassland conversion project.

2. Project location:

3. Fence length:

4. Contracting method: no material contracting.

Second, the scope of project contracting

1, concrete column is dug and buried;

2. Erecting nets and barbed wire;

3. Gate installation;

4, material hauling loading and unloading;

Third, the term of the contract.

Start date:

Date of completion:

Total calendar days of contract duration.

Fourth, quality standards.

Engineering quality standard: qualified

Verb (abbreviation of verb) contract price

Amount (in words): (RMB) ¥ 10,000 Yuan.

Intransitive verb engineering payment

The total project price shall be paid in two phases, within 65,438+05 days after the signing of the first phase agreement, and 65,438+00% after the completion and acceptance of the second phase project.

Seven. Project quality

1, the construction unit must carry out the construction in strict accordance with the design drawings and technical disclosure requirements, according to the construction sequence. After the completion of the previous sub-project, it must be reported to the on-site supervision engineering and technical personnel for inspection before the next construction.

2. If the quality is unqualified, Party A has the right to ask Party B to rework or stop work, and the losses caused thereby shall be borne by Party B..

These columns should be in a straight line. The spacing of small columns is 8m, and the buried depth is 0.4m The spacing of middle columns is 200m, and the buried depth is 0.6m The backfill soil should be compacted. The fence should be erected with the span between two middle columns as the operating unit, and the fence pull ring should be fixed on the columns according to the requirements of design drawings.

Eight. Main responsibilities of Party A and Party B

1, the main responsibilities of Party A.

(1) Be responsible for setting out the measuring points, and do a good job of "three links and one leveling" before construction.

(2) Supply concrete columns, nets, barbed wire, gates and equipment on time.

(3) Send site representatives to supervise the progress and quality of the project and check the concealed works.

(4) Responsible for organizing the project completion acceptance.

2. Main responsibilities of Party B

(1) is responsible for water, electricity, roads and temporary facilities in the construction site.

(2) Prepare the construction organization plan and prepare for the construction.

(3) Provide the project progress to Party A in time and manage the material supply.

(4) Carry out the construction in strict accordance with the specifications, ensure the engineering quality, and finish it on time according to the contract time.

Nine. Entry into force of contract

Place of signing the contract: This contract is made in quadruplicate, with Party A and Party B holding two copies respectively. It will take effect after being signed and sealed by both parties, and will be terminated when the project completion settlement price is settled.

Party A: Party B:

Signature: signature:

Date of signing: Date of signing:

;