General situation of Gushan hydropower station project in Hanjiang River
Gushan Hydropower Station is mainly composed of discharge structures, power stations, navigation structure and dams on both banks. The dam is a concrete gravity dam with a crest elevation of 188m, a dam length of 640.45m and a maximum dam height of 49.2m The normal water level of the power station reservoir is 177.23m, and the corresponding storage capacity is109000 m3. Four tubular hydrogenerators were installed, with a single unit capacity of 45MW, a total installed capacity of 180MW, and an average annual power generation of 6120,000 kW·h, thus improving the navigation channel in the reservoir area by 34.9km.
The static investment is RMB, and the total construction period is about 4.5 years.
- Related articles
- Small tofu fortune-telling _ Tik Tok small tofu fortune-telling
- Where is the place to hang wishes in Youmin temple?
- What movies has Tony Leung Chiu Wai made?
- The fortune teller's eight characters are in the book. There were originally three, but for some reason one was missing. What should I do? Will it have an impact? Or borrowed.
- What's the difference between a fortune teller and a fortune teller? Is there a big difference between a fortune teller and a fortune teller?
- Is the name test accurate?
- Excuse me, in Buddhism, what do you mean by four kinds of double luck with the same life?
- Rare Palmprint Fortune Telling _ Is Palmprint Fortune Telling Accurate?
- Ladygaga's horoscope _ladygaga's horoscope
- What is the face of a man who is capable and ambitious?