Fortune Telling Collection - Fortune-telling birth date - How to get to the overpass from the platform in high-speed railway station, Jiangxi?

How to get to the overpass from the platform in high-speed railway station, Jiangxi?

Ji 'an West high-speed railway station can walk out of the station passage from the west side to the overpass in the center of the station building.

A 1 passenger entrance overpass with a clear width of 12m is set in the center of the station building as a passenger entrance passage. On the west side, a 1 passenger exit tunnel with a clear width of10m is set as the passenger exit passage, and the distance between the center of the tunnel and the center of the station building is 88.65m..

As of February 20 19, the construction area of Ji 'an West Station is 40,658 square meters, and the total construction area of the station building is 30,000 square meters, including 4,000 square meters of overhead floor and 26,000 square meters of main building. The total height of the station building is 26.9 meters, the building is about 200 meters long from north to south, 57 meters wide from east to west, and the drop-off platform is 20 meters wide. 1 passenger entrance overpass with a clear width of 1 2m is set in the center of the station building as the passenger entrance passage, and1passenger exit tunnel with a clear width of10m is set in the west side as the passenger exit passage. The distance between the tunnel center and the station building center is 88.66.

general layout

As of 20 19 and 12, the station building of Ji 'an West Station is a three-story (including overhead floor) plane station building, and the passenger transport organization adopts the mode of "getting on and off". The elevated floor includes the exit hall, ticket office, commercial service, express transfer, substation and so on. The first floor is the disembarkation platform, waiting hall, wide hall, VIP business waiting hall, ticket office, passenger service hall, office area and equipment area. The second floor is the waiting hall, passenger service hall and management room. The south side of the drop-off platform is connected with the urban viaduct, and the main body adopts concrete frame structure. In addition, there are long-distance passenger stations and bus stations on the left and right sides of high-speed railway station House, which realize seamless connection between public railways and taxis, and private cars and taxis can directly reach the entrance.