Fortune Telling Collection - Comprehensive fortune-telling - Shenze Nanguan fortune-telling _ Shenze divination

Shenze Nanguan fortune-telling _ Shenze divination

Hutuohe water control project

The north embankment of Hutuo River starts from Anding Village in Lingshou, passes Zhengding and Gaocheng, and ends at Wuji Niuxinzhuang, with a total length of 53.86 kilometers. Among them, Lingshou is 3.2km, Zhengding is 30.26km, Gaocheng14.2km and Wuji is 6.2km.. Generally, the crest width is 3-5m, the widest is 8m, the height is 2m-3m, and the highest section is 4m.

195 1 spring, Wuyi dike from Pingantun to Sunda Village was completed. It is 4 kilometers long and 3 meters wide at the top, with an average height of 1.5 meters and a slope of 1:2. The construction is organized by Zhengding County People's Government. It was completed in May 1 year, so it was named Wuyi Dike.

1954, the levee section from Wuji Haozhuang to Peili Village is 6.2km long, and the section from Lianghe to Fotang is1.5km long, which is organized by Wuji County People's Government. The bottom width is 20 meters and the top width is 3 meters; The width of the small top is 1m and the height is1m. The earthwork is 6.5438+0.5 million cubic meters, with 275,000 workers and an investment of 60,000 yuan.

1955, and the fixed diversion north dike was changed to 1500m. 1956 spring, embankment 4000m. Gaocheng mobilized volunteers to repair only 780 meters of the Moon Dike and 4,090 meters of the Sigong Dike, making 25,000 cubic meters of earthwork and employing more than 6,000 workers. That year was a big flood, and the Wuji Haozhuang levee burst at 25 places, with a length of 1322 meters. After the flood season, according to the spirit of the provincial drainage and plugging conference, 28.7 kilometers of the north dike was repaired, and the construction was organized by Zhengding and Gaocheng counties respectively, with a total of 300,400 cubic meters of earthwork and 6,543,800 workers.

/kloc-in the spring of 0/957, the section from Xiuhaozhuang to Peili dike, with a length of 5600 meters, was constructed by Wuji County. There are 62,569 cubic meters of earthwork and 24,679 workers.

From 65438 to 0963, the 49 km levee from Shaotong to Hezhu generally overflowed, and it was repaired according to the pre-flood standard after the flood.

Before the flood season of 1968, Wuji generally raised the domestic dike section 1 m, with a top width of 4 meters; Inner slope 1: 3, outer slope1:2; And add six ramps for practicing bicycles. Earth and stone works 192300 cubic meters, which will be constructed by county Haihe headquarters.

1974 Autumn, when the Hutuo River was regulated, the restoration works of the extended dikes of Lingshou Anding, Zhengding dayangzhuang and Taipingzhuang were completed, with a total earthwork of 192300 cubic meters and 80700 workers. The top width is 4m, and the slope is 1:2. They were built by the county Haihe headquarters.

1975, flood dike of Dingdasun Village was added in spring, with a length of 2058m. Earthwork is 74,000 cubic meters, with 415,000 workers and an investment of 72,000 yuan. Construction is organized by county water conservancy bureau. In the same year, the Haozhuang dike section of Wuji County was also renovated. 198 1 year, the section from Hucun to Ping 'an Tundi was added and repaired, with a length of 3154m, earthwork178,000m3, 95,700 man-days, and an investment of105,800 yuan. Construction is organized by county water conservancy bureau. 1982 completed the hardened pavement on the top of Zhengding dike, with a length of1423m and an investment of 13000 yuan. The south embankment of Hutuo River starts from Tazikou in Zhengding, passes through Gaocheng and ends at Jinxian Longquan, with a total length of 43.02 kilometers. Among them, it is 3 kilometers from Tazikou in Zhengding to Dafeng Tun, 23.82 kilometers from Xiaofeng in Gaocheng to Xili Village, and 0/6.2 kilometers from Jinxianjiao Palace to Longquan Valley.

1948, pedicure to zhang jia zhuang levee. It is 5050m long, 3m wide at the top, 2m high on average, and the slope is 12 1.5. Earthwork is 63,000m3, and labor is 3 1 0,000. Jinxian County Committee organized the construction.

1In July, 949, many executions occurred in the south bank of Hutuo River. The dike from Gaocheng to Xili Village is 7.5km in winter, with a crest width of 2m and an average height of1.5m. The dike is connected with Xili Village, fengcun and Jiaogong Dune. The construction is organized by Gaocheng County People's Government. In the same year, the west levee and south levee of zhang jia zhuang in Jinxian County were completed. The west dike from Jiaogong to zhang jia zhuang is 1.5km long, with a crest width of 3m and an average height of 2m. The south dike is10.3km long, from zhang jia zhuang to Longquan Valley, with a crest width of 1.5 to 3m and a dike height of 1.5 to 3m.

195 1 completed the east section of Gaocheng dike, with a length of 6230m, earthwork14440m3 and 5350 workers. 1952 completed the embankment reinforcement project from zhang jia zhuang to Longquan, with a length of 7500m, a top width of 3m and an average height of 2.2m. Earthwork10430m3 was completed. The construction department of Jinxian county organized 5000 laborers to carry out the construction, and the project was assisted by the people's society. Subsidy per square soil 1 kg millet. 1954 In the flood, Liyuan Village and Shangshuzhuang Village in Gaocheng burst their banks and were repaired in time after the flood.

1in the spring of 954, 2,772 migrant workers were mobilized to build Gaocheng Dongguan Yuedi, with a length of11088m and earthwork of1/kloc-0. In August of that year, floods caused deaths in Dongguan, Maozhuang and Xing 'an. After the flood season, according to the spirit of the whole province drainage plugging conference, plugging was carried out, with a total length of 10.83 km, earthwork143,300 cubic meters and 73,600 workers.

/kloc-in the spring of 0/957, the old dike from Jiaogong to Longquan in Jinxian County was renovated with industrial loans, extending by 3650 meters. Earthwork 1.68 million cubic meters was completed, 83,000 people were employed and the investment was 1.40 million yuan.

196 1 in July, 2007, the southwest moon dike of Zhangli Village in Jinxian County was completed. It is 800 meters long, 3 meters wide at the top, 2.3 meters high on average, and earthwork1.4000 cubic meters. 1963 completed the task of heightening and thickening Jinxian section 16.2km in March. Labor force 1.3 million, construction period 1 week, earthwork 1. 1.34 million cubic meters, and subsidized drinking water fee of 4,500 yuan. It was a flood in August 2008. After the flood season, according to the dike standards before the flood season, 9,727 meters of the Gaocheng section dike was repaired, with a total of 73,500 cubic meters of earthwork, 46,400 workers and an investment of 44,240 yuan.

1978 due to the planning of zhang jia zhuang new village in Jinxian county, the local route was changed to 1800 meters, with 40,000 cubic meters of earthwork and 23,800 workers. Beidadi is a remote levee on the left bank of Hutuo River, with a total length of 109.5km ... initially from Ancheng Village in Wuji County to Zaoying in Shenze County, with a total length of 37.7 km. After the reconstruction of 1967 to 1968, it starts from Dongzhu Village, (Ding) and Shen (Ze) Highway in Wuji County in the west, connects with the old dike via Dongluo in Wuji County, and passes through Anping, Raoyang and Wuqiang to xian county Hub in Cangzhou area. In the 34th year of the Republic of China (A.D. 1945), the Public Works Department of Jidong Administrative Office organized local people to build a levee with a crest width of 1.5-2.5 m and a height of 1.5-2.5 m, thus forming the embryonic form of the North Dike.

1949 Shenze Nanzhuangyuan-Zhaoba section was completed along the river, with a length of 2,552.6 feet, a dike height of 4 to 6 feet and a top width of 5 to 7 feet. Employment/kloc-0.4 million people, earth and stone work/kloc-0.58 million cubic meters, and subsidy for millet 67,700 Jin. In the same year, after the flood season, the dike was rebuilt, and 24,700 cubic meters of earth and stone were completed, with 0.7 million workers/kloc and 45,800 Jin of millet subsidy.

1950 spring, reinforce the levee with work instead of relief.

1954 There are 9 execution ports in the south of Zhaoba Village, Shenze, with a maximum flow of 586 cubic meters per second. After the water is flooded, the blockage will be repaired in time.

1956, from the Eastern Han Dynasty in Wuji to the top of the small town, there were 23 execution ports, with a length of 1592 meters. The measured maximum flood peak discharge at Shenze North Zhongshan Hydrological Station is 8700 cubic meters per second, and Xizhaozhuang and Dazhi have two outlets. In June 5438+10 in the same year, the embankment section from the Eastern Han Dynasty to Xiaocheng was repaired with work as relief, with a length of 8,408 meters, and 284,000 cubic meters of earthwork was completed, with 0/57,200 workers/kloc. After the restoration, the crest width is 6.5-8.5 meters, the height is 2.2-3.5 meters, the slope is 1: 3, and the national grain supplement is 1.6 thousand Jin.

1May, 957, 2 1.4 km embankment project from Zhaoba to Zaoying in Shenze was restored, with earthwork 163 1000 cubic meters and investment of 64,700 yuan. In June, Lizhuang River in Wuji County was intercepted and the embankment was repaired, with a length of 221.78m.. In June+10, 5438, the height from the Eastern Han Dynasty to Xiaocheng was 4000m, and the height was 0.5m A total of 284,000m3 of earthwork was completed, and the labor was157,200.

/kloc-in the spring of 0/963, Shenze dike was renovated. It was the flood of that year, and Peng Zhaozhuang burst 60 meters. 1964 Repair the dike according to 1963 standard before flood season. A total of 289,800 cubic meters of earthwork was completed, with workers172,700, and investment 19 1900 yuan; Repairing Wuji Ancheng-Cheng Xiao section12370m, earthwork122400m3, with an investment of 87,000 yuan.

1in the spring of 967, the alignment of the ring section of the north dike and the straightening and bending of the Shenze section were completed. The newly-built dike in Wuji is 9,850 meters long, with 850,000 cubic meters of earthwork. It will be built by Haihe headquarters in Baoding area, with 425,000 workers and an investment of 340,000 yuan.

In April 1970, the endless section was reinforced by 2,500m, with 9,800m3 earthwork and more than 30,000 workers.

During the period of 1974, hydraulic treatment was carried out for ditching on the top of the dike in the dangerous section of Shenze Zhaoba, and the soil was broken by 3,550 cubic meters.

1975 The sand-blown road section and rubber coating of Shenze Dabao were renovated for 2,900 meters, and the thickness of rubber coating was 0.3 meters; In addition, the platform project of the eighth bid section of Zhao was built, and the earthwork1940,000 cubic meters was completed, and the labor was 100, with an investment of 79,000 yuan.

1976 The platform from Shenze Nanguan to Zaoying was built, with a length of10748m, a top width of 4m and a height of 2m. Earthwork 1 1.2 1 10,000 cubic meters, with 57,400 workers and an investment of 36,800 yuan. That year, 4000 meters of pressure grouting was carried out in Zhaoba section, and 48,000 workers were used.

1977 grouting in eastern Shenze 1200m, with 23,000 workers and an investment of 48,000 yuan.

1978 Shenze section 1 16m for secondary grouting, drilling 92286 holes, and filling 1993.5 cubic meters.

1979, 7000m from Zhaoba to Beizhongshan was grouted twice, 35000m holes were drilled, and soil was poured 1300m3.

198 1 year, grouting will be carried out at 8000m from Wuji Luoshang to the town, and it will take 1 10,000 man-days with an investment of 55,000 yuan.

1982: key section of luoshangzhi town 1700 m grouting, employing10.5 million people, with an investment of 50,000 yuan.

1984, 8000m grouting twice, 7200m electrical sounding, 9600 employees, investment of 37,000 yuan. In the same year, the Shenze levee was paved with 3.5 kilometers of glue, and the ground was broken 1. 1.0000 cubic meters, and the labor was used1.01.0000, with an investment of 23,000 yuan.