Fortune Telling Collection - Ziwei fortune-telling - Rural demolition is located in

Rural demolition is located in

Donglei Matai Village, located on both sides of Yingbin Road in Jiaodong Street, is the north gate of Handan City. There are more than 3000 villagers in this village. Previously, the village's infrastructure was incomplete, the buildings were chaotic, the corridors in the village were narrow, the sewage was cross-flowing, and the problem of mess was serious. At the construction site, the old houses in the village have been leveled, three large construction machines are being cleaned, workers are working in the rain, and the scene is in full swing. Zhang Gunian, secretary of the second street branch of the village, told reporters that Dong Lei Matai's house is small and crowded, with the highest seismic fortification intensity less than level 5, and some even below level 3, and there is still a phenomenon of disorderly construction. The wire connection is chaotic, and the fire hazard is great. Home and community, Ziweiyuan community, etc. Built on the land less than 1000 meters away from Donglei Matai village, it is located in Donglei Matai. These modern urban communities are the envy of 3000 villagers in Matai Village, Donglei. ■ The government will demolish the Second Street and the Fifth Street of Matai Village in Donglei, which belong to the trusteeship village of Handan High-tech Development Zone and are located at the north gate of Handan City. When foreign businessmen enter Handan from Beijing-Shenzhen Expressway, the first thing they see is the shabby and backward scene of Matai Village in Donglei. A foreigner who came to Handan ridiculed: "Other cities entered the city as soon as they got off the expressway, and they entered the village as soon as they got off the expressway." Now people in Handan generally believe that the city of Handan has changed greatly in the past three years, and the demolition and transformation of the city will be even stronger. If Matai Village in Dong Lei is not rebuilt, there will be no overall changes in the whole city. The appearance of Donglei Matai Village not only affects the quality of life of the villagers, but also affects the overall image of Handan City. Not long ago, the Handan Municipal Party Committee and Municipal Government listed the transformation of Donglei Matai Village as a key project of the city. The second and fifth streets of Matai Village in Donglei are located on both sides of Yingbin Road and included in the first phase of renovation. ■ There are 279 villagers in Second Street and Fifth Street of Matai Village, Dong Lei, which are included in the first-phase reconstruction difficult project, with a construction area of over 80,000 square meters and an area of 198 mu. According to the plan, of the 198 mu, 100 mu will be used to build overpasses and green spaces, and 98 mu will be used to build villagers' relocated houses. As the land for relocation has been greatly reduced, the relocation cost has increased. According to this plan, the Second and Fifth Street Committees of Dong Lei Matai Village negotiated development with a number of real estate development companies, but all of them ran aground because of the high development cost. Facing the expectations of the masses and the needs of urban construction, as the custodian of the second and fifth streets of Matai Village, Dong Lei, Handan High-tech Development Zone finally made up its mind to tear it down no matter how much it cost. To this end, the high-tech development zone took out 65.438+0.5 billion yuan as the start-up capital for the demolition work. In order to save the cost of demolition and fundamentally safeguard the interests of villagers, the Second Street Committee and the Fifth Street Committee decided to bypass the developers and engage in their own development. The village should tear down its own houses, build its own houses, purchase its own steel, cement, bricks, stones and other building materials, invite tenders for construction units, build its own houses and make its own arrangements. Operate under the "sunshine" and accept the supervision of villagers. In this way, the cost of renovation can be reduced to the maximum extent, and the masses can become the biggest beneficiaries of village renovation. After the demolition, the land and buildings are all owned by the villagers after the cost is removed. On the one hand, the villagers look forward to the demolition and live a city life as soon as possible. On the other hand, the villagers believe that the demolition is their own business and the benefits will not flow out. So once this plan was announced, it was warmly welcomed by the villagers immediately. ■ Competing for demolition In order to allow villagers to demolish smoothly, leaders of Handan High-tech Zone, Second Street and Fifth Street made detailed demolition plans on the basis of many investigations. Not only the compensation standard is stipulated, but also the incentive policy of giving 5,000 yuan to 30,000 yuan to the villagers who have been demolished within the specified time is formulated. A villager in Erjie, a family of three, has a house, homestead 170.6 1 square meter, with a construction area of 233.23 square meters. According to the demolition regulations, he can get the relocation area of 1.75 times the homestead area, and the relocation area reaches 298.57 square meters. According to this area, he can get three houses. At the same time, he can also get compensation of * * * 1.2 million yuan for the renovation and demolition of the original building area. At present, the house price in Handan is about 3,000 yuan per square meter, and Cheng's real estate and compensation amount to one million yuan. Villagers like Cheng are common in the village. When interviewed by reporters, the villagers were happy to say that this demolition not only allowed them to live in a good house, but also their children's house. Together with the compensation, everyone has become a millionaire, and can get a demolition reward of 30,000 yuan within the specified time. If they can't be demolished within the specified time, they will not only be rewarded, but also be looked down upon by the villagers. Why not dismantle it earlier? On May 9, Handan High-tech Zone held a mobilization meeting for demolition in the second and fifth streets of Matai Village, Donglei. By May 14, it took only five days to demolish 279 households with an area of 80,000 square meters. This progress is unimaginable elsewhere. ■ Happy Life Zhang Jingzhi, secretary of the second street branch of Matai Village, Dong Lei, told the reporter that after the old village is demolished, a number of new high-rise houses will be built on the original site, so that the villagers can live in buildings with sufficient lighting, good ventilation and reasonable structure, and equipped with water, electricity, heating, communication network, cable TV and other supporting facilities. After renovation and new construction, the seismic fortification intensity of the building is above 7 degrees, and the fire protection reaches the national A-level standard. Zhang Jingzhi said that the village collective should build a number of commercial gables in the transformation, which can be rented and sold, so that the villagers can get more property income. These incomes are mainly used for welfare subsidies such as property fees and utilities in the future. According to the renovation plan, basically every household will have 3-4 houses after moving back. In addition to self-occupation, you can also rent it. In the future, villagers in Matai Village of Donglei can collect rent every month and share the bonus without any worries. The transformation of the village will benefit future generations more. Now that there is basically no land on the Second Street and the Fifth Street, it is impossible for the next generation of Donglei Matai Village to beg for food from the land. They must receive urban education and integrate into urban life. Village reconstruction is an epoch-making development opportunity and a historical turning point to bid farewell to the traditional life mode, which will make Dong Lei Matai's descendants bid farewell to farming life completely and integrate into urban life. It is understood that by demolishing Donglei Matai Village, Handan will build a magnificent overpass at the entrance of the city, which will greatly enhance the image and urban taste of Handan, completely reverse the impression of foreign merchants on Handan, and realize the transformation from "entering the village" to "entering the city". According to the plan, eight high-rise residential buildings will be built in the new community, each with a height of 30 floors and a construction area of nearly 200,000 square meters. In addition to the relocation of 6,543,800 square meters of villagers, the High-tech Zone will recover the previous demolition investment by selling the remaining 6,543,800 square meters of houses.