Fortune Telling Collection - Free divination - What is the compensation standard for land expropriation, land transfer and land transfer in rural areas of Yuelu District, Hunan Province?
What is the compensation standard for land expropriation, land transfer and land transfer in rural areas of Yuelu District, Hunan Province?
Adjustment of attachment and young crops collection on rural collective land
Notice of compensation standard
Chang 20 13
County (city) people's government, the municipal government units:
In order to further standardize the compensation for land expropriation in our city and effectively safeguard the legitimate rights and interests of the rural collective economic organizations, villagers and other rights holders whose land has been expropriated, according to the social and economic development level of our city, in accordance with the Regulations on Land Expropriation Compensation and Resettlement in Changsha City, the Measures for the Implementation of Land Expropriation Compensation in Changsha City (DecreeNo. 103 of the Municipal Government) and the Notice of the People's Government of Hunan Province on Adjusting the Land Expropriation Compensation Standard in Hunan Province (Xiang [20/KLOC-)
1. Rural collective land expropriation shall be implemented in Furong District, Tianxin District, Yuelu District, Kaifu District and Yuhua District, and the compensation for housing, production and living facilities, relocation, transition, timely removal, young crops, flowers and seedlings transplantation, collective facilities, and compensation standards for gravel yards, prefabricated yards and brick yards shall be adjusted. See Annex for specific compensation standards.
Second, the people's governments of Wangcheng District, Changsha County, Liuyang City and Ningxiang County may, in accordance with the requirements of this circular and in combination with local conditions, formulate compensation standards for ground attachments and young crops on rural collective land, which shall be implemented after being submitted to the provincial and municipal people's governments for approval.
Three, this compensation standard shall come into force as of the date of promulgation. Before the implementation of this compensation standard, if the announcement on the implementation of land acquisition compensation and resettlement scheme has been issued, it shall still be handled according to the original provisions.
Attachment: Expropriation of attachments and compensation standards for young crops on rural collective land.
Changsha Municipal People's Government
201310 June 12
attachment
Expropriation of attachments and young crops compensation standards on rural land
I. Young crops compensation standard (I) Unit: RMB/mu
Land grade
kind
Compensation standard
Reserve bill
paddy field
one
2600
two
22 10
Professional vegetable field
one
6500
In addition, 20% of the professional vegetable field standard is used to compensate the cost of production facilities.
two
5460
Professional fish pond
one
4420
Adult fish in professional fish ponds are compensated according to professional fish pond standards, and fry and fingerling are compensated according to 1.2 times of professional fish pond standards; In addition, 20% of the professional fish pond standard is used to compensate the cost of production facilities.
two
3770
Dry soil
one
1820
swimming pool
reservoir
one
2600
Adult fish in ponds are compensated according to the standard of paddy fields adjacent to the land; The adult fish in the reservoir shall be compensated by 50% of the paddy field standard of the adjacent land.
two
22 10
Young crop compensation standard (II) Unit: Yuan/mu
Land grade
kind
Compensation standard
Reserve bill
Seedlings, flowers and economic trees
one
2600
Compensation shall be made according to the land standards and farming years of the neighboring paddy fields; The maximum compensation period shall not exceed 4 years.
two
22 10
Artificial wood
one
2600
Compensation shall be made according to 50% of the standard of combined farming years of adjacent land in paddy field; The maximum compensation period shall not exceed 4 years.
two
22 10
Nonartificial forest
one
2600
50% to 100% shall be compensated according to the land standard of adjacent paddy fields.
two
22 10
Note: 1. Woodland area is calculated according to its horizontal projection area;
2. intercropping crops compensated young crops from their high categories.
Two, flower seedling base flower seedling transplantation fee
diversification
measure
planting density
(plant/mu)
Compensation standard (yuan/mu)
Reserve bill
Trunk diameter measured at1.3m above the ground.
(Above the ground1.5m)
height
All kinds of flower seedlings
/kloc-below 0/meter
2000-3000
3250-3900
1, and the compensation is limited to the approved flower and seedling base;
2, planting density is lower than the standard according to the actual density of 80% compensation;
3, the location of the transplant in different places by the landless households to solve, no compensation.
1 meter or more
700- 1000
3900-5200
4-9 cm
600-700
7800-9 100
10- 19 cm
300-450
10400- 1 1700
More than 20 cm
150-200
13000- 15600
Three. Standard unit of compensation for residential houses: RMB/m2.
one
two
three
Housing compensation fee
Compensation for house decoration and facilities
housing allowance
house
structure
Compensation standard
New conversion (year)
calibrate
Farmers' subsidy standard
Non-agricultural subsidy standard
≤5
>5
Steel and concrete
Nine hundred and seventy
100%
95%
7 10
1. According to the legal construction area of the house to be demolished, the subsidy for the first and second floors is 1040 yuan/m2, and the subsidy for the third floor (including the third floor) is 520 yuan/m2;
2. According to the number of agricultural population whose land is expropriated, it will increase by 40,000 yuan/person.
According to the legal construction area of the house to be demolished, the subsidy for the first and second floors is 1800 yuan/m2, and the subsidy for the third floor (including three floors) is 900 yuan/m2.
brick setting
A type of ...
780
580
The second category/category
7 10
Brick wood
650
100%
520
building
520
390
Reserve bill
1, housing compensation is calculated according to the legal construction area and housing structure of the demolished house.
2. The compensation for house decoration and facilities shall be calculated according to the legal construction area of the house to be demolished, with one-time compensation.
3. Pay 40,000 yuan/person directly to the District People's Government for housing security according to the number of agricultural population whose land has been expropriated; Farmers who have been demolished voluntarily apply not to buy affordable housing provided by the District People's Government, and subsidies can be distributed to households. If the agricultural population whose land is expropriated is the only child, the housing subsidy for 1 individual will be increased with the "one-child certificate" issued by the family planning department.
4. The increase or decrease coefficient of building structure, decoration and facilities is calculated according to the technical requirements of residential building structure, decoration and facilities.
5. The appraisal of the steel-concrete structure shall be conducted by relevant experts organized by the land department.
6. The calculation of construction area shall be carried out in accordance with the Chinese national standard (GB/T 50353-2005) Code for Calculation of Construction Area of Building Engineering.
7. The replacement price of temporary buildings is calculated according to the compensation standard of "house compensation fee" in the first item of this table; Comprehensive service life refers to the remaining service life within the approved service life.
Four. Standard unit of enterprise housing compensation fee: RMB/m2.
Building structure
Compensation standard
Single layer height increases
New conversion
≤5
>5
Steel and concrete
Nine hundred and seventy
Single-storey height > 3m ≤ 4m, the price increase of storey height is 30% of the compensation standard, 4m≤5m > 40%, 5m ≤ 6m > 50%, and single-storey height >; 6 meters, the height increase is calculated by 50% of the compensation standard, and then the compensation is increased by 1 meter/3 yuan/square meter.
100%
95%
brick setting
A type of ...
780
The second category/category
7 10
Brick wood
650
100%
building
520
Reserve bill
1, this standard is applicable to enterprise house demolition with collective construction land use certificate and legal property right certificate.
2, office buildings, factories, housing compensation according to the legal construction area of the demolished houses, housing structure combined into a new calculation.
3. The office building decoration and facilities of the enterprise shall be calculated according to the legal construction area and the standard of "compensation for house decoration and facilities" in Item 2 of Table 3, and the factory building decoration and decoration shall not be compensated.
Five, housing relocation subsidies, transitional subsidies, demolition incentives on schedule.
project
calibrate
Reserve bill
Housing relocation subsidy
8 yuan/m2? time
According to the legal construction area, the relocation subsidy is up to 2 times; To hold the "People's Republic of China (PRC) Disabled Persons' Card", the housing relocation subsidy will be increased by 50% according to the standard.
Housing transitional subsidy
32 yuan/m2? moon
Suitable for houses of township (town, street) and village enterprises. According to the legal construction area, the transition period is 24 months, including the loss of production and business suspension during the transition period; Enterprises that have stopped production or business are subsidized by 50% of the standard; Temporary buildings are not subsidized.
8 yuan/m2? moon
For residential buildings, the transition period is 24 months according to the legal construction area; Temporary buildings are not subsidized.
Incentive fee for scheduled demolition
260 yuan/m2
If the land is demolished on schedule within the time limit stipulated in the announcement on the implementation of the land acquisition compensation and resettlement plan, it shall be calculated according to the legal construction area; Temporary buildings will not be rewarded.
Six, residential housing structure, decoration and facilities technical requirements
Building structure
Technical requirements for structure, decoration and facilities
Steel and concrete
1. Main structure
Frame structure; Cast-in-place reinforced concrete beams and columns are load-bearing and non-load-bearing partitions; Roof turret; Cast-in-place or prefabricated stairs (steps); Prefabricated hollow slab floor; Precast hollow slab steel wire mesh concrete waterproof roof with hollow slab insulation layer; Cast-in-place gutter drainage; Open drains or culverts built with cement bricks around the house; Pick balconies, metal, wood or brick handrails between ladders; The clear height of the ground floor is 3.2m, and that of the second floor is 3m.
2. Floor, wall and top surface
Indoor floors meet the decoration standards of non-slip floor tiles, granite, marble or solid wood and laminated wood floors; Porcelain paint is scraped on the indoor wall, and the ceiling decoration standard is above the first-class ceiling; Kitchen, bathroom, bathroom wall skirt veneer; The front and both sides of the external wall are decorated with tiles, and the rest are dry-bonded stones above the decoration standard.
3. Door and window requirements
All kinds of security doors, plastic steel, aluminum alloy glass windows, all kinds of metal window protectors, all kinds of rain-proof awnings, all kinds of decorative doors, doors and windows are decorated with Fraxinus mandshurica or imitation beech wood plates.
4. Other requirements
Indoor wardrobe and other living facilities are complete (including indoor partitions of various materials); Kitchen, bathroom and toilet facilities, indoor and outdoor water and electricity facilities.
Increase or decrease factor
1. If the height of insulation layer exceeds 70cm, the compensation will be increased by 2% according to the main body of the house, and the decoration and facilities in the insulation layer will not be compensated;
2. For every increase or decrease of the building height,10cm, the main body of the building will be compensated1%;
3. If there is an overhead floor, the compensation will be increased by 2% according to the main body of the house, and the decoration and facilities in the overhead floor will not be compensated;
4. Lump sum compensation for house decoration and facilities.
Building structure
Technical requirements for structure, decoration and facilities
Brick-concrete type I (more than two floors, including two floors)
1. Main structure
Brick-concrete structure; 24 cm away from the wall; Walls, beams and columns bear the same load; Cast-in-place or prefabricated stairs (steps); Prefabricated hollow slab floor; Precast hollow slab steel wire mesh concrete waterproof roof, with hollow slab insulation layer or flat roof green tile roof; Cast-in-place gutter drainage; Open drains or culverts built with cement bricks around the house; Pick balconies, metal, wood or brick handrails between ladders; The story is 3 meters high.
2. Floor, wall and top surface
Indoor floor (including moisture-proof layer) meets the decoration standards of non-slip floor tiles, granite, marble or solid wood and laminated wood floors; Porcelain paint is scraped on the indoor wall, and the decoration standard is higher than the first-class ceiling on the top; Kitchen, bathroom, bathroom wall skirt veneer; The front and both sides of the external wall are decorated with tiles, and the rest are dry-bonded stones above the decoration standard.
3. Door and window requirements
All kinds of security doors, plastic steel, aluminum alloy glass windows, all kinds of metal window protectors, all kinds of rain-proof awnings, all kinds of decorative doors, doors and windows are decorated with Fraxinus mandshurica or imitation beech wood plates.
4. Other requirements
Indoor wardrobe and other living facilities are complete (including indoor partitions of various materials); Kitchen, bathroom and toilet facilities, indoor and outdoor water and electricity facilities.
Increase or decrease factor
1. If the height of insulation layer exceeds 70cm, the compensation will be increased by 2% according to the main body of the house, and the decoration and facilities in insulation layer will not be compensated;
2. For every increase or decrease of the building height,10cm, the main body of the building will be compensated1%;
3. If there is an overhead floor, the compensation will be increased by 2% according to the main body of the house, and the decoration and facilities in the overhead floor will not be compensated;
4. Lump sum compensation for house decoration and facilities.
Building structure
Technical requirements for structure, decoration and facilities
Brick-concrete type II
1. Main structure
Brick-concrete structure; 24 cm brick wall or 18 wall; Precast hollow slab steel wire mesh concrete waterproof roof or flat roof tile roof; Cast-in-place gutter drainage; Open drains or culverts built with cement bricks around the house; The story is 3 meters high.
2. Floor, wall and top surface
Indoor floor (including moisture-proof layer) meets the decoration standards of non-slip floor tiles, granite, marble or solid wood and laminated wood floors; Porcelain paint is scraped on the indoor wall, and the decoration standard is higher than the first-class ceiling on the top; Kitchen, bathroom, bathroom wall skirt veneer; Bricks are pasted on the front and both sides of the external wall, and other dry-bonded stones are pasted (decorated).
3. Door and window requirements
All kinds of security doors, plastic steel, aluminum alloy glass windows, all kinds of metal window protectors, all kinds of rain-proof awnings, all kinds of decorative doors, doors and windows are decorated with Fraxinus mandshurica or imitation beech wood plates.
4. Other requirements
Indoor wardrobe and other living facilities are complete (including indoor partitions of various materials); Kitchen, bathroom and toilet facilities, indoor and outdoor water and electricity facilities.
Increase or decrease factor
1. If the height of insulation layer exceeds 70cm, the compensation for the main building will increase by 2%, and the installation in insulation layer will increase.
Decoration and facilities will not be compensated;
2. For every increase or decrease of the building height,10cm, the main body of the building will be compensated1%;
3. If there is an overhead floor, the compensation will be increased by 2% according to the main body of the house, and the decoration and facilities in the overhead floor will not be compensated;
4. Lump sum compensation for house decoration and facilities.
Seven, residential housing outdoor facilities and production housing compensation standards.
project
unit
Compensation standard (yuan)
Reserve bill
Outdoor facilities
building
52000
One-time compensation for all outdoor facilities (except production houses) of 4 households; For every increase of 1 person, the compensation fee will be increased by 13000 yuan.
atelier
(Serving agricultural production)
square meter
156
1, the production room of each household shall not exceed 100 square meter, and the unapproved over-surface part shall not be compensated;
2, the production room should have walls, heart-filled doors and windows, livestock houses, miscellaneous houses in the height of more than 2.2 meters, can not meet the above standards by 50% consideration;
3. After one-time compensation for the production house, no other expenses will be compensated.
Agricultural tools, livestock
family
2000
Farmers who turn to non-agricultural hukou are subsidized according to this standard.
Eight, enterprise housing indoor and outdoor facilities compensation standards
project
Compensation standard
Indoor and outdoor production equipment can be relocated.
According to the dismantling, installation and relocation of equipment, the relocation fee is calculated according to the actual engineering quantity.
Indoor and outdoor production facilities cannot be relocated.
One-time compensation shall be made according to the red line land area of 65 yuan/m2.
Nine, collective facilities compensation standard unit: yuan/mu.
kind
Facility compensation standard
Reserve bill
Professional vegetable field
6500
1, collective facilities shall be compensated in lump sum;
2, other agricultural land does not include enterprise land, fish ponds, roads and homestead;
3. If it is necessary to build a pond in another place, the storage capacity of the original pond shall be calculated as 13 yuan /m3, and the pond facilities shall not be compensated separately; The pond does not need to be restored, and the compensation per mu is 2600 yuan;
4. The concrete road (the required thickness is greater than 18cm) shall be compensated by 60 yuan /m2, and the asphalt road shall be compensated by 30 yuan /m2; 5, pole line migration according to the collection area of 2600 yuan per mu lump sum compensation (except for power poles above 380 volts).
Professional fish pond
6500
Shuitian
3900
Dry soil
1950
Other agricultural land
1300
Ten, sand yard, precast yard, brick yard compensation subsidy standards.
project
Specification (unit)
Standard (yuan)
Reserve bill
Shashichang
Total length of conveyor belt
Less than 200m (including 200m)
208000
1. All compensation expenses such as disassembly, handling and installation of mechanical equipment, matching of electrical equipment, poles and wires, site leveling and relocation of legal sand and gravel yard shall be paid in one lump sum;
2, conveyor belt in more than 200 meters, every increase of 65438+0 meters, increase the compensation fee of 390 yuan.
Subsidy for suspension of production and business
Below 200 meters
26000
Subsidies for the suspension of production and business of each gravel field shall be one-time subsidies according to the total length of conveyor belt.
200-500 meters
39000
Over 500 meters
52000
Demolition as scheduled
Tendi prize
individual
78000
Complete the demolition of buildings (structures) and vacate the land within the time limit stipulated in the announcement on the implementation of the land acquisition compensation and resettlement plan.
Prefabricated site
tool
260000
1. All compensation expenses such as disassembly, handling and installation of mechanical equipment, matching of electrical equipment, leveling of poles and wires, water towers, pools, wells and sites, and relocation expenses of legal prefabrication yard shall be paid in one lump sum;
2. The land area is not less than 5 mu, and the reinforced concrete flat with a thickness of 20 cm is not less than 3 mu. For every 0.5 mu decrease in the above two areas, it will decrease by 10%.
Subsidy for suspension of production and business
individual
26000
One-time subsidy for the suspension of production and business of each prefabrication yard.
Demolition as scheduled
Tendi prize
individual
52000
Complete the demolition of buildings (structures) and vacate the land within the time limit stipulated in the announcement on the implementation of the land acquisition compensation and resettlement plan.
brickfield
Annular kiln
1 (door)
104000
1. All compensation expenses such as demolition, handling, installation, electrical equipment matching, poles and wires, water towers, pools, wells, roads, slope protection, alkali leveling, site leveling and relocation expenses of legal brick factory shall be paid in one lump sum;
2, the land area of not less than 5 mu, every 0.5 mu reduction10%;
3, the chimney height is not less than 70 meters, every 65438 0 meters reduced by 5%.
Subsidy for suspension of production and business
1 (door)
2600
Subsidies for the suspension of production and business of brick factories shall be lump-sum according to the number of kiln doors.
Demolition as scheduled
Tendi prize
individual
78000
Complete the demolition of buildings (structures) and vacate the land within the time limit stipulated in the announcement on the implementation of the land acquisition compensation and resettlement plan.
XI. Other subsidy standards
project
unit
Subsidy standard (yuan)
Reserve bill
Mechanical demolition fee
square meter
20
According to the housing construction area, it is controlled by the requisitioned land.
Concrete and stone graves
grave
3000
Double burial plus 50%
Graves made of concrete and masonry
grave
2000
be the same as the above
Soil powder
grave
1200
be the same as the above
- Previous article:What is the image in the rumor (for example
- Next article:What is the meaning of "death" in tarot cards? Is the type of boyfriend.
- Related articles
- The orientation of wealth in 2023, the position of the god of wealth in 2023, and the method of making a fortune?
- What's the use of getting married and watching birthdays? What are the advantages of matching eight characters?
- What do you mean, "it's all your fault that turtles give birth to tigers and rafters destroy jade"?
- What can Feng Gua predict?
- I dreamed that an old man told my fortune.
- Flower language of sunflower and daisy
- It is said that Zhou Wang has Terran luck. Why can da ji, a fox, get close?
- Does the Five Elements Theory for Fortune-telling belong to materialism?
- I dreamed that bees stung my fingers.
- Oracle Bone Inscriptions with the word "ghost"