Fortune Telling Collection - Fortune-telling birth date - How to coordinate environmental problems caused by resource development in Yanhe County?

How to coordinate environmental problems caused by resource development in Yanhe County?

First, strengthen organizational guarantee and establish a normalized inspection system. The implementation plan of "river length system" in Yanhe Autonomous County was introduced, and the "double river length system" was implemented in the main stream and 26 tributaries of Wujiang River. The secretary of the county party committee and the county magistrate are appointed as the overall "river chief", and the main party and government leaders of the relevant townships (towns, streets) are appointed as the "river chief" to comprehensively control the problems of indiscriminate occupation and construction of key rivers, disorderly surrounding and blocking, and indiscriminate mining and discharge. At the same time, the cage manufacturing raw materials and fish sales market were specially rectified. Up to now, there have been more than 50 inspections, and the Wujiang cage 100382 square meters has been cleared.

The second is to strengthen overall coordination and create a regional governance mechanism. Renovation of domestic garbage and domestic sewage in county towns, along the Wujiang River and densely populated areas. Start the renovation of pipe network and dredging in the county, expand the sewage treatment scope of the county to Yanhe Development Zone and Sizhou New District, strengthen the operation supervision of sewage treatment plants, and speed up the construction of the second phase of sewage treatment project with a total investment of 1.5 1.00 billion yuan. The sewage treatment in towns along the Wujiang River plays the role of market mechanism, and the construction and operation of urban domestic waste treatment facilities are liberalized. Take joint venture, cooperation, PPP and other ways to speed up the construction of waste pyrolysis gasifier in Hongdu town and solve the problems of production and domestic waste treatment in five northern towns. It will invest 70 million yuan to cover 14 townships (streets), build 14 garbage transfer stations, 1 194 mobile garbage bins,10/lift trucks and 29 8-ton garbage compression transfer vehicles.

The third is to strengthen problem-oriented and implement list-based accountability rectification. Formulate the Regulations on Ecological Environment Protection of Wujiang River in Tujia Autonomous County along the Yangtze River, and implement the national policy of returning farmland to forests and grasslands. Villages and towns along the Wujiang River vigorously implemented the project of returning farmland to forests and grasslands and controlling rocky desertification, and implemented a total of 6,543.8+0.7 million mu of "six green" ecological afforestation projects, including 6,543.8+0.3 million mu of the new round of returning farmland to forests, 6,543.8+0.5 million mu of comprehensive control of rocky desertification, and afforestation subsidies from the central government. 294 forest rangers were hired to carry out all-weather management and protection of key forest areas, and the ecological environment of Wujiang River Basin in the county was obviously improved. At the same time, water sources in sensitive areas such as Baini River and hongdu river, tributaries of Wujiang River, were monitored regularly, and test reports were issued regularly, listing 32 problems. At present, all accountability and rectification have been carried out to ensure the environmental protection of Wujiang River in accordance with the law.