Fortune Telling Collection - Comprehensive fortune-telling - How to treat the south bank of the second phase of the North Taoyuan River Regulation Project in Xiaojianxi Community of Hetao Street, Chengyang

How to treat the south bank of the second phase of the North Taoyuan River Regulation Project in Xiaojianxi Community of Hetao Street, Chengyang

River dredging, river widening, river bank reinforcement, vegetation restoration and flood control facilities construction.

1. River dredging: clear the silt in the river and improve the flood discharge capacity of the river.

2. River widening: under the premise of ensuring the safety of the river, the river is widened to improve the water capacity of the river.

3. River embankment reinforcement: reinforce the river embankment to prevent soil erosion and ensure the safety of the river.

4. Vegetation restoration: Plant vegetation on both sides of the river to prevent soil erosion and improve the ornamental value of the river.

5. Establish flood control facilities: establish flood control facilities on both sides of the river, such as flood dikes and walls, to ensure the safety of residents around the river.