Fortune Telling Collection - Comprehensive fortune-telling - Where is the question bank of engineering budget?

Where is the question bank of engineering budget?

A. Settlement method of construction drawing budget plus visa B. Settlement method of construction drawing budget plus coefficient lump sum

C. Square meter cost lump sum settlement method D. Bidding settlement method

1 1, composition of overhead ().

A. Enterprise management fees B. Financial expenses C. Other expenses D. Taxes

12, the "four lines" in the budget refers to (), etc.

A. centerline of outer wall B. centerline of inner wall C. net length of inner wall D. outer edge of outer wall

13, the basic methods of compiling material consumption quota are ().

A. Field technical determination method B. Test method C. Statistical method D. Theoretical calculation method

14, labor consumption indicators include ().

A. basic labor B. material labor exceeding transportation distance C. auxiliary labor D. poor labor range

15, material price difference adjustment methods are ().

A. single material price adjustment B. material price adjustment comprehensive coefficient C. A. B. combination adjustment D. actual adjustment

16, tax is composed of ().

A. business tax B. urban maintenance and construction tax C. education surcharge D. poor materials

17, the basic principle of engineering quantity calculation is ().

A. consistent caliber B. consistent unit C. consistent rules D. consistent requirements

18, the construction budget preparation method is ().

A. physical method B. physical quantity method C. unit valuation method D. calculation method of total cost of sectional works

19, the project budget settlement review form is ().

A. Expert review B. Individual review C. Joint review D. Entrusted review

20. The content of the final accounts for completion consists of two parts ().

A. Cover B. Description C. Schedule D. Final Statement

Third, true or false:

1. Taxes are legal and mandatory, and should be calculated in full, without preferential treatment. ( )

2. The first kind of expenses in the use fee of mechanical machine shift is also called variable expenses. ( )

3. Material cost refers to the cost of an engineering entity consumed in the construction process, excluding the amortization cost of turnover materials. ( )

4. The construction drawing budget is the construction budget. ( )

5. External scaffolding, single-row scaffolding, decorative scaffolding and internal scaffolding are all calculated in square meters according to the horizontal projection area. ( )

6. The freight and miscellaneous expenses of the budgeted price of materials have included the second handling fee of materials. ( )

7. Direct engineering costs are referred to as direct costs. ( )

8. Material price difference cannot be used as the basis for calculating management expenses and other expenses. ( )

9. The construction area is calculated according to the horizontal area above the external wall of the building. ( )

10. All pipes, fittings and valves with the same nominal diameter can be connected, although their outer diameters are different. ( )

Fourth, short answer questions:

1. Describe the preparation procedure of construction drawing budget.

2. What problems should be paid attention to when sorting out the engineering quantity?

3. What are the steps to prepare the construction budget with the physical method?

4. Briefly describe the steps of preparing budgetary estimate with budgetary estimate quota.

5. What are the main review contents of the project budget and settlement?

6. Describe the composition of other direct costs.

7. What are the calculation forms of construction budget?

8. Why do you want to compare two calculations?

9. There is a similar project budget. Why do you want to modify the budget estimate?

10, why should we prepare for the completion settlement?

A volume of reference answers:

1. 1, D 2, B 3, A 4, C 5, C 6, D 7, A 8, A 9, B 10, b1,A 12, b/kloc- B 19、B 20、B 2 1、C22、D 23、A 24、A 25、B 26、C 27、C 28、A 29、C 30、B 3 1、D 32、C 33、D34、C35、D 36、D 37、A 38、B 39、A 40、B

2. 1,ABC 2,ABC 3,ABCD 4,BC 5,ABC 6,BC 7,BCD 8,BD 9,ABD 10,ABCD 1 1,ABC 12,ACD 13,ABC。 ABC 16、ABC 17、ABC 18、ABC 19、BCD 20、BD

Third, 1 right; 2 wrong; 3 wrong; 4 wrong; 5 wrong 6 wrong; 7 wrong; 8 pairs; 9 pairs; 10 pair

Fourth,1p15; ; 2 P2063 P3684 P3945 p 4 10 6 p 1 15; 7 P3668 P3709 P405 10 P4 14