Fortune Telling Collection - Comprehensive fortune-telling - The design scheme needs to be worked out before the factory building is rebuilt. What's in this design?

The design scheme needs to be worked out before the factory building is rebuilt. What's in this design?

Before the renovation, there were many available power facilities in the factory building, so it is necessary to design the drawings for the second renovation. As a designer, it is necessary to know the original layout of the factory building in detail and plan the new layout of power facilities on the principle of "simplicity, clarity and beauty". In addition, the problems found in the drawings and the contact with the original design unit should be corrected in time so as not to affect the renovation progress of the factory building.

It is also very important for designers to communicate with factory owners in advance and choose a route that can be moved at any time, so as to avoid the influence of new power supply layout on equipment handling and production.

In the selection of decoration materials, we should strictly follow the national standards and design drawings, shop around, with high quality and low price. The purchased equipment and materials must have factory certificates and inspection reports. After the materials enter the site, the quality inspector, together with professional and technical personnel, will test the materials entering the site, and the unqualified materials will not be used.

During the secondary decoration design, technicians should write professional and detailed construction plans for disclosure, clarify the construction preparation of each process, the protection of quality standard products and other matters needing attention, and make disclosure to the professional construction personnel on site in written form.