Fortune Telling Collection - Comprehensive fortune-telling - The latest bidding project in Shengzhou
The latest bidding project in Shengzhou
1. Project name: Phase II design of Huangchengshan (Zhouhu) tourist trail project in Shengzhou, and the project location: Huangchengshan (Zhouhu) in Shengzhou.
2. Bidding scope: overall scheme design, preliminary design, design budget, construction drawing design, whole construction process and follow-up services of the second phase design of Chenghuangshan (Zhouhu) Trail Project in Shengzhou City.
3. Bidding method: open bidding; Qualification examination method: post-qualification examination.
4. The estimated total investment of this project is 1 10,000 yuan, including Jian 'an project investment 1 10,000 yuan and standard service investment 1 10,000 yuan. The quotations in this tender range from 30% to 40%. The tender control price of this project subject to tender (i.e. the highest tender price and the upper limit of the rate quotation interval) is RMB 10000 yuan, and the risk control price of this project subject to tender is RMB 10000 yuan (the lower limit of the rate quotation interval). If the tender offer is higher than the tender control price of this tender, the tender will be rejected; If the price is lower than the risk control price, it will not be included in the calculation of bid evaluation benchmark price, and the bidder who is rejected in the evaluation of bid documents will not be included in the calculation of bid evaluation benchmark price. If the tender offer is lower than the risk control price, the winning bidder shall pay the performance bond within 5 working days from the date of the end of the publicity of the successful candidate, and shall pay the difference between the net tender offer and the risk control price additionally. If the winning bidder fails to submit it, it shall be deemed as giving up the bid.
5. Source of funds: self-raised funds.
6. Construction scale: 1 On the basis of the first phase of Huangcheng (Chuanhu) scenic trail, improve the scenic trail in the area and form a complete Huangcheng (Chuanhu) greenway system, including pre-policy treatment, bicycle riding and scenic trail construction, greening landscape transformation (memorial hall, post station, toilet, parking lot, signs) and other supporting facilities. 2. Make full use of the cultural elements of Huangchengshan (Chuanhu Lake) in Shengzhou, including Chuanhu Tower, Chuanhu Forest Park, Jade Emperor Hall, Mingxin Temple, Yingen Pavilion, Dong Tang Village Party Construction Park, Lanwan Mountain Pond and Tangwan Reservoir. And organically connect cultural elements in series, connect points and divide functions to create a cultural greenway around the mountains with Shengzhou characteristics; 3 Dong Tang Village to Hehuaping Village Tour Trail Project, Mingxinling Road to Dong Tang Village Tour Trail Project, Dong Tang Village to Hututa Tour Trail Project, etc.
7. Quality requirements: in line with the depth requirements of the Provisions on the Compilation Depth of Design Documents for Building Engineering [20 16 Edition].
8. Design cycle: the scheme optimization shall be completed within 15 calendar days after the contract is signed, the preliminary design and design budget shall be completed within 15 calendar days after the scheme is approved, and the construction drawing design shall be completed within 30 calendar days after the preliminary design is approved.
9. Is this project a key project at or above the municipal level: Yes (Yes or No).
Second, the bidding registration requirements:
1, enterprise qualification requirements: this tender requires bidders to have a comprehensive first-class qualification in engineering design or both of the following qualifications: 1 Grade B and above in municipal industry; Grade A qualification in landscape architecture design, with corresponding personnel, technology and financial capacity; Among them, the qualification requirements of the proposed project leader of the bidder: senior engineer (landscape architecture) or above. If the person in charge of the proposed project is an employee of the bidding enterprise, the payment list or certificate of the social security institution to which the bidder belongs during the payment period (6 months before the bid opening) shall prevail (the names of the payment unit and the bidding unit must be the same, and the special seal for social security payment certificate shall be affixed in addition to the online self-service printing of the social insurance participation certificate with verification code); If the person in charge of the proposed project is a retired employee, the retirement certificate (original) and the on-the-job certificate (original) shall prevail, and the maximum age limit for retired employees is 65 years old.
2. Main qualifications:
Enterprises outside the province need to provide relevant certificates or screenshots of relevant web pages of inquiry records of enterprises outside the province entering Zhejiang to undertake business filing.
The enterprise, legal representative and project leader have no criminal record of bribery within three years (subject to the inquiry of China Judgment Document Network);
The person in charge of the enterprise or project has not been restricted or cleared out of the local market records by the relevant regulatory authorities (industry authorities and bidding regulatory authorities) (the specific time shall be subject to the time limit stipulated by the regulatory authorities);
The enterprise and its legal representative are not included in the list of people's courts who have been executed for breach of trust (subject to the query of "China Executive Information Open Network" in the Supreme People's Court). If there are special circumstances, the bidder shall provide an effective basis for the enforcement of the court in the bidding documents;
In the "Credit China" website (not included in the list of people who have been executed for breach of trust.
This tender does not accept (accept or not accept) consortium bidding.
3, the tender documents:
The bidding documents, supplements (questions and answers, clarifications) and revised documents of this project are released by Shengzhou public electronic trading system of * * * resources, and bidders can download them themselves.
The tender documents will be collected from the date of announcement to 2022. Potential bidders should pay attention to the announcement of Shengzhou public resources electronic trading system, and the tenderee will not notify them one by one. If the bidder fails to bid due to its own procrastination, it will be regarded as not responding to the bidding documents and its bidding documents will not be accepted.
Potential bidders must log in to Shengzhou Public Resources Electronic Trading System with CA digital certificate suitable for Shengzhou Public Resources Trading Center, and download the bidding documents by themselves under the corresponding announcement. Bidders must fill in relevant information. If the relevant information is not filled in, the bidding documents will not be accepted.
Potential bidders who have not obtained the CA digital certificate of Shengzhou public * * * resource trading center should first go through the registration procedures of the transaction subject and obtain the CA digital certificate of Shengzhou public * * * resource trading center.
Submission method of bid documents: the bidder submits the bid documents on the spot so as to leave immediately. The tenderee and the tendering agency will arrange special personnel to receive the tender documents from 8: 00 to 9: 00 in 2022. Venue: No.699 Guanhe South Road (Shengzhou International Convention and Exhibition Center), at the entrance of the first floor of the west gate of the North Building, overdue or not delivered to the designated place.
Three. Other related contents
1. Bid bond: 32,000 yuan, paid by electronic guarantee, transfer (telegraphic transfer) or online banking at the bidder's option. For the payment by electronic guarantee, please refer to the Operation Manual of Electronic Guarantee for Shengzhou Public Electronic Trading Platform for * * * resources (for Trial Implementation) for the specific operation process, and the insurance period of electronic guarantee must not be less than the validity period of bidding; Submission time: received before 16:00 (Beijing time), 2022, and the bid bond shall be subject to the time of receipt (including the submission of electronic guarantee). If the bidder's deposit is not received in time or transferred from its basic deposit account due to the bidder's own reasons, it will be regarded as not responding to the bidding documents and its bidding documents will not be accepted.
2. Bid evaluation and shortlisting method: In the first stage, all bidders will be shortlisted, only the bidders' scheme designs will be graded and reviewed for compliance, and the design schemes of the top five effective bidders will be recommended according to the scores from high to low (if the bidders' schemes are tied, the tenderer will determine the ranking order of the tied scoring schemes by drawing lots); The top 5 bidders recommended are shortlisted for the second-stage review (less than 5 bidders are all shortlisted). However, if there are less than three effective bidders who have entered the second-stage evaluation, the three bidders who have not entered the second-stage evaluation will be replaced in turn according to the ranking. When evaluating bids, all bidders have been replaced, but the number of valid bids is still less than three. If the bid evaluation committee decides to reject all bids due to obvious lack of competition, the tenderee shall re-invite bids according to law.
3. Bid evaluation method: comprehensive evaluation method of technical scoring system.
This bid evaluation adopts the comprehensive evaluation method of technical scoring system to evaluate and score the technical bid, credit bid and business bid. When the comprehensive evaluation method of technical scoring system is adopted, the commercial bid will evaluate and score the total bid price. If the tender offer is higher than the tender control price of this tender, the tender will be rejected; If it is lower than the risk control price of this tender, it will not be included in the calculation of bid evaluation benchmark price; Bidders rejected in the evaluation of bid documents are not included in the calculation of bid evaluation benchmark price, and the bid evaluation benchmark price is calculated according to the actual remaining finalists. After the results of bid evaluation are announced, the benchmark price of bid evaluation will not be adjusted.
4. Payment of design fees: stipulated in the tender documents.
5, the winning scheme and the winning bidder to determine the way:
How to determine the bid winning scheme: The tenderee shall determine from five schemes recommended by the bid evaluation committee.
How to determine the winning bidder: the bidder with the highest comprehensive score in the second stage is recommended as the winning candidate, and the total bid price of the winning bidder is the winning bid price.
6. Announcement of bid evaluation results and bid-winning publicity: The bid evaluation results will be announced after the bid evaluation and before the bid-winning candidates are publicized. Before the bid-winning notice is issued, the tenderee will publicize the situation of the candidate winning the bid on Shengzhou Public Resources Trading Online for 3 days.
7. Contact person for bidding: Wu Juping Tel: 0575-8333 125 1.
Contact person of bidding agent: Song Jia Tel: 15068558 123.
4. If the relevant contents of this announcement are inconsistent with the bidding documents, the bidding documents shall prevail.
- Related articles
- Ask the master to help calculate the fortune of that year.
- I ching fortune telling: palm reading _ palm reading
- Is birth fortune telling accurate _ Is birth fortune telling credible?
- How to treat the fate of husband and wife in previous lives? What should I do if I always feel that my relationship with him remains unchanged? The point is whether you like him or not.
- Find eight-character numerology analysis ~ ~ ~!
- Is it true that the fortune teller said he could make a fortune? _ Is it true that the fortune teller said that he could make a fortune?
- Park's fortune telling
- Is fortune telling predestined? Expression pack _ Is this your fate after fortune telling?
- Where is the fortune-telling more accurate in Changsha _ Where is the fortune-telling more accurate in Changsha, Zhihu
- How do you know your best friend?